Fire During Framing — New Commercial Building
Industry: Construction / General Contractor
A 14,000 sq ft light commercial building under construction was destroyed by fire during the wood framing phase. The fire started due to temporary heating equipment left running overnight. Project value was $2.1M. Construction was 40% complete at time of loss.
Claim amount: $925,000
Outcome: Builders risk policy (completed value form, $2.1M limit) covered the loss. Settlement: $780,000 for destroyed framing lumber, structural materials, and site cleanup; $145,000 in soft costs (additional permit fees, architectural re-drawing, 90 additional days of construction loan interest). Project was rebuilt and completed 5 months after the fire. Without builders risk, the GC and owner would have split the $925,000 loss — likely project-ending.
Lesson: Temporary heating equipment is one of the most common causes of builders risk losses. Written hot work and temporary heating policies, daily site closure inspections, and smoke detection even during construction significantly reduce this exposure.